Événements model casting En Ligne
1 filtre appliqué
En ligne
Date
Catégorie
Format
Prix
Langue
Devise
1 filtre appliqué
En ligne
IEC 62443: Mapping 62443 Zones onto the Purdue Model — Levels 0 to 5 in Practice
Monday at 12:30 PM PDT + 155 en plus
IEC 62443: Mapping 62443 Zones onto the Purdue Model — Levels 0 to 5 in Practice
Monday at 12:30 PM PDT + 155 en plus
ISO 8800: Safety of Foundation Models and End-to-End Driving Stacks under ISO 8800
Tuesday at 8:30 AM PDT + 155 en plus
ISO 8800: Safety of Foundation Models and End-to-End Driving Stacks under ISO 8800
Tuesday at 8:30 AM PDT + 155 en plus
FTA: Software Faults in Fault Trees — Modeling Systematic Failures Without Failure Rates
Monday at 1:30 PM PDT + 155 en plus
FTA: Software Faults in Fault Trees — Modeling Systematic Failures Without Failure Rates
Monday at 1:30 PM PDT + 155 en plus
V-Model: Reviews, Walkthroughs, and Inspections — Running Fagan-Style Reviews That Find Real Defects
Monday at 9:00 AM PDT + 155 en plus
V-Model: Reviews, Walkthroughs, and Inspections — Running Fagan-Style Reviews That Find Real Defects
Monday at 9:00 AM PDT + 155 en plus
V-Model: Test Case Derivation from Requirements — Equivalence Classes, Boundaries, and Error Guessing
Monday at 1:30 PM PDT + 155 en plus
V-Model: Test Case Derivation from Requirements — Equivalence Classes, Boundaries, and Error Guessing
Monday at 1:30 PM PDT + 155 en plus
ISO 21448: The Four-Area Model in Practice — Shrinking Area 3 and Bounding Area 2
Monday at 6:00 PM PDT + 155 en plus
ISO 21448: The Four-Area Model in Practice — Shrinking Area 3 and Bounding Area 2
Monday at 6:00 PM PDT + 155 en plus
FTA: Common Cause Failure Modeling — Beta Factor, MGL and Alpha Factor in Fault Trees
Tuesday at 9:00 AM PDT + 155 en plus
FTA: Common Cause Failure Modeling — Beta Factor, MGL and Alpha Factor in Fault Trees
Tuesday at 9:00 AM PDT + 155 en plus
Join Nabenet - Biopsychosocial model & early risk flags in the workplace
Tue, Nov 17, 11:00 AM GMT+11
Join Nabenet - Biopsychosocial model & early risk flags in the workplace
Tue, Nov 17, 11:00 AM GMT+11
V-Model: The Left Side Done Right — Architecture Design Verification Before Any Code Exists
Monday at 2:30 PM PDT + 155 en plus
V-Model: The Left Side Done Right — Architecture Design Verification Before Any Code Exists
Monday at 2:30 PM PDT + 155 en plus
V-Model: Case Study — A Failed Assessment Rebuilt: Closing 40 Traceability Findings in 12 Weeks
Tuesday at 12:30 PM PDT + 155 en plus
V-Model: Case Study — A Failed Assessment Rebuilt: Closing 40 Traceability Findings in 12 Weeks
Tuesday at 12:30 PM PDT + 155 en plus
BIMA Masterclass | Rethinking the SDLC: An AI-Led Delivery Model That Works
Thu, Oct 8, 10:00 AM GMT+1
BIMA Masterclass | Rethinking the SDLC: An AI-Led Delivery Model That Works
Thu, Oct 8, 10:00 AM GMT+1