Événements model casting En Ligne
AI & Functional Safety: Field Monitoring, Drift Detection and Safe Model Updates
Monday at 8:00 AM PDT + 155 en plus
AI & Functional Safety: Field Monitoring, Drift Detection and Safe Model Updates
Monday at 8:00 AM PDT + 155 en plus
AI & Functional Safety: MLOps Meets Functional Safety — Configuration Management for Models
Tuesday at 6:30 PM PDT + 155 en plus
AI & Functional Safety: MLOps Meets Functional Safety — Configuration Management for Models
Tuesday at 6:30 PM PDT + 155 en plus
ISO 26262-11: Analogue and Mixed-Signal Fault Modeling under Part 11
Monday at 9:00 AM PDT + 155 en plus
ISO 26262-11: Analogue and Mixed-Signal Fault Modeling under Part 11
Monday at 9:00 AM PDT + 155 en plus
V-Model: Regression Strategy — Selecting, Prioritizing, and Justifying What You Re-Run
Tuesday at 8:00 AM PDT + 155 en plus
V-Model: Regression Strategy — Selecting, Prioritizing, and Justifying What You Re-Run
Tuesday at 8:00 AM PDT + 155 en plus
ISO 13849: SISTEMA from Zero — Modeling Your First Safety Function Correctly
Monday at 10:30 AM PDT + 155 en plus
ISO 13849: SISTEMA from Zero — Modeling Your First Safety Function Correctly
Monday at 10:30 AM PDT + 155 en plus
IEC 62443: Wireless and IIoT in the Zone Model — Bringing Untethered Assets Under Control
Monday at 1:00 PM PDT + 155 en plus
IEC 62443: Wireless and IIoT in the Zone Model — Bringing Untethered Assets Under Control
Monday at 1:00 PM PDT + 155 en plus
V-Model: Verification Independence — Who May Test What at Each Integrity Level
Monday at 9:00 AM PDT + 155 en plus
V-Model: Verification Independence — Who May Test What at Each Integrity Level
Monday at 9:00 AM PDT + 155 en plus
V-Model: Validation vs Verification — Designing a Validation Program That Proves the Right System
Monday at 9:00 AM PDT + 155 en plus
V-Model: Validation vs Verification — Designing a Validation Program That Proves the Right System
Monday at 9:00 AM PDT + 155 en plus
V-Model: Structural Coverage — Statement, Branch, and MC/DC Explained with Worked Code
Monday at 6:30 PM PDT + 155 en plus
V-Model: Structural Coverage — Statement, Branch, and MC/DC Explained with Worked Code
Monday at 6:30 PM PDT + 155 en plus
V-Model: Integration Strategy — Big-Bang vs Incremental and the Stub/Driver Problem
Tuesday at 12:00 PM PDT + 155 en plus
V-Model: Integration Strategy — Big-Bang vs Incremental and the Stub/Driver Problem
Tuesday at 12:00 PM PDT + 155 en plus
V-Model: Anomaly and Defect Management — From Test Failure to Safety-Relevant Disposition
Tuesday at 9:00 AM PDT + 155 en plus
V-Model: Anomaly and Defect Management — From Test Failure to Safety-Relevant Disposition
Tuesday at 9:00 AM PDT + 155 en plus
V-Model: Continuous Compliance — CI/CD Pipelines That Generate Safety Evidence Automatically
Tuesday at 8:00 AM PDT + 155 en plus
V-Model: Continuous Compliance — CI/CD Pipelines That Generate Safety Evidence Automatically
Tuesday at 8:00 AM PDT + 155 en plus